Las Palmas Avenue Overlay
Project/ Clien
Las Palmas Avenue Overlay – City of Patterson, CA/Cecil & Cecil Enterprises (Consultant)
Project Size
Just over a ½ mile of Las Palmas Avenue including side streets, turnpockets,
shoulders, and center turn medians.
Project Address
Las Palmas Avenue, Patterson, CA
Solutions / Services Provided
- Provided full in-depth inertial profile data acquisition including IRI left wheel track, IRI right wheel track, cross slope percentages, high-definition pavement surface imaging, and Google Earth data overlay.
- Performed year-to-year comprehensive data analysis including individual wheel track defect counts, left and right wheel track IRI comparison, MRI comparison, and cross slope comparison for each lane, turn pocket, and median section.
- Prepared detailed analysis spreadsheets and presented findings to the engineers at the City of Patterson over a three-year period.
- The City of Patterson was highly impressed with the technology and analysis used to generate the results, which led to being hired for an additional nearby project with similar pavement issues.
Industry/ Market Segment
City
Project Details
- Paving contractor hired by the city had below-spec compaction issues and was given the option to either remove and replace the pavement or provide a 4-year warranty.
- SAM Rhodes was hired by Cecil and Cecil on behalf of the City of Patterson to objectively obtain pavement data and analyze year-to-year changes related to rideability and durability.
- Initial data collection was performed on 12/7/2021, with subsequent data collections on 12/7/2022 and year three on 12/8/2023.
- The year four test was cancelled due to budget limitations and because the year three results showed only minimal changes, which City of Patterson engineers and SAM Rhodes determined were within normal degradation for a heavily traveled city roadway.